The Lookout at West Beach - Summertime in the Heart of West Beach | House in Santa Barbara
2 Bedroom House in West Beach, Santa Barbara
2 BEDROOMS | 1 BATHROOM | 4 GUESTS
This new and stylish beachy Paradise Retreats loft is located in the carefree West Beach neighborhood. It’s filled with small bungalows and boutique hotels that are just steps from the beach, Stearns Wharf, State Street, Funk Zone, and the Harbor. The Brewhouse, Toma, Jeannine's Bakery, and Chad’s restaurants frequented by locals, and Amtrak station are all close by making the walkability that much better.
Walls of windows bring maximum light into this airy loft. The spacious Living Room is surrounded by an updated Kitchen and galley style Dining space. A custom breakfast bar and reading nook flank the dining table adding additional seating for larger groups. The Bedrooms are inspired by the coastal modern aesthetic connected by a spa-like Bathroom. A private outdoor deck offers additional lounge seating underneath the -palm trees.
The Lookout sits above The Cottage at West Beach and The Hideaway at West Beach each offering the similarly unique design and amenities. All 3 units of this Triplex are available through Paradise Retreats. Imagine a wonderful family reunion and rent all three!
HIGHLIGHTS:
- Walk to the Beach and Downtown!
- Option to rent all 3 Units!
- Newly Renovated and Designed
NOTE: Parking for 1 car in private garage. There is street parking with time restrictions on the weekends.
**GUEST AGREES TO ELECTRONICALLY SIGN OUR RESERVATION AGREEMENT within 2 days of booking. (Emailed to Guest upon booking.)**
POLICIES:
- Minimum Age of Primary Guest: 30 years or older.
- Quiet Hours: 9:00pm-9:00am. Please respect our neighbors.
- No Smoking on Property.
- Pet Policy: Call us!
- No Party Rentals or Hosted Events.
- Check-in: 3:00pm or later.
- Check-out: 10:00am or earlier.
- Manager/Homeowner Reserves the Right to Deny Reservation.
- Until Confirmed, Rates are Subject to Change.
The Lookout at West Beach - Summertime in the Heart of West Beach is located in West Beach. The Lookout at West Beach - Summertime in the Heart of West Beach provides accommodation, featuring Air Conditioner, Parking, TV, among other amenities. This House features Air Conditioner, Parking and TV to make your stay a comfortable one.
The Lookout at West Beach - Summertime in the Heart of West Beach has 2 Bedrooms , 1 Bathroom, and max occupancy of 4 people. The minimum rental for this property is 1 nights, but this can change depending on the season you plan on staying. Previous guests have given good rated it, and VRBO labeled it a top-rated House because of the excellent services rendered by the owner or manager of this House, and has consistently provided great experiences for their guests. Most families or guests that use it recommend it to their friends and some of them are repeat guests. House has a friendly neighborhood, and the West Beach has interesting places to visit. If you want to learn more about the House in West Beach, such as places to visit and things to do nearby, you can check below to learn more.
Amenities
Facility Overview
-
Air conditioning
-
Heating
-
Hair dryer
-
1 bathroom
-
Towels provided
-
Shower/tub combination
-
Bed sheets provided
-
2 bedrooms
-
Dining table
-
Living room
-
Spices
-
Toaster
-
Coffee/tea maker
-
Oven
-
Ice maker
-
Dishwasher
-
Stovetop
-
Microwave
-
Refrigerator
-
Washing machine and dryer
-
Laundry facilities
-
Onsite parking
-
Onsite parking options include a garage
-
Service animals only (pets not allowed)
-
Smoke-free property
-
Fishing nearby
-
Bicycle on site
-
Mountain biking nearby
-
Hiking nearby
-
Winery tours nearby
-
Sailing nearby
-
Hiking/biking trails nearby
-
Surfing/body boarding nearby
-
Horse riding nearby
-
Birdwatching nearby
-
TV
-
Games
-
Unit size: 1000 sq ft (93 sq m)
-
English
-
Near a zoo
-
Highchair
-
Travel crib
-
Babysitting service available
-
Concierge services
-
Iron/ironing board
-
Phone
-
Chef
-
Free WiFi
-
Balcony
-
Barbecue grill
-
Smoke detector installed (host has indicated there is a smoke detector on the property)
-
Fire extinguisher
-
Carbon monoxide detector installed (host has indicated there is a carbon monoxide detector on the property)
-
First aid kit
Policies
Extra-person charges may apply and vary depending on property policy government-issued photo identification and a credit card, debit card, or cash deposit may be required at check-in for incidental charges host has indicated there is a carbon monoxide detector on the property host has indicated there is a smoke detector on the property onsite parties or group events are strictly prohibited safety features at this property include a fire extinguisher and a first aid kit special requests are subject to availability upon check-in and may incur additional charges; special requests cannot be guaranteed this property is managed through our partner, vrbo. you will receive an email from vrbo with a link to a vrbo account, where you can change or cancel your reservation
Reviews
FAQ's
Is this West Beach house pet-friendly for guests?
No, pets are not allowed at this property. Check the guest reviews to learn what guests had to share.
Does the West Beach house have a swimming pool?
No, this West Beach house does not have a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.
How much does it cost per night to stay in West Beach house?
Best-rates for the West Beach house starts from $681 per night with includes Sports/Activities, Laundry, Balcony/Terrace, Security/Safety, Child Friendly, Kitchen, Fireplace/Heating, Barbecue/Outdoor Cooking, Air Conditioner, Parking, TV, Bedding/Linens, Wellness Facilities, Guest Services, Entertainment, Internet with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.
Is West Beach house a family-friendly place to stay?
Based on the information we have received from the owner or our partner, this is considered to be a family-friendly property. Families have rated this house Good or guests have recommended them suitable for families. As reported by the owner or manager, the house has specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.
Is the West Beach house wheelchair accessible or offer services for disabled guests?
Based on the information received from our partner, the West Beach house has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.
What is the minimum night stay policy for the West Beach house?
Based on the information reported by the owner or manager, the West Beach house indicates 1 day stay policy at this house. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.
What cancellation policy is in place for West Beach house?
Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.